Capacity:64 MW
Turbines:28 Siemens
Location:Scotland
Status:In operation
Rated Output:2.3 MW / turbine
Paul’s Hill Wind Farm is based on 28 turbine locations, a metering building, two anemometer masts and installed underground HV and SCADA cables, temporary construction compound, access and onsite tracks and associated infrastructure (incl. grid connection). The wind farm has a capacity of 64 MW and is located southwest of Elgin and 15 km west of Charleston of Aberlour.

The project construction commenced in January 2004 and the wind farm started full operation in May 2006.